Status / Incidents

degraded · resolved

Spoofed Handler #3 capacity reduced

Available spoofed capacity on Handler #3 dropped by about 40% while stale nodes were replaced. Handlers #1, #2 and #4 stayed at full capacity.

Affected
Spoofed Handler #3
Started
Sep 8, 2026, 3:05 AM UTC
Resolved
Sep 8, 2026, 6:11 AM UTC
Duration
3.1 h

Response time

Peak 96 ms

Error rate

Peak 5.1 %

Forwarded capacity

Peak 50 Gbps

Timeline

  1. Investigating

    Capacity telemetry on Handler #3 fell below the expected floor.

  2. Identified

    Health checks marked several nodes stale after a routing change.

  3. Mitigating

    Stale nodes were replaced. Jobs were packed onto healthy members.

  4. Resolved

    Pool rebuilt. Capacity back to the advertised band.

← All incidents Status of Services